OUR PROCESS

The Smartt approach is the DIRTT approach. Build with a construction system that gives total design freedom and greater certainty in cost, schedule, and outcomes. Be more creative and conscious about the way you build. It’s the Smartt way!

01

Plan

02

Design

03

Manufacture

04

Install

05

Adapt

01. Plan

Incorporating DIRTT during the initial planning phases of your project enables us to optimize your building’s core and shell. Our team collaborates closely with you to assess how DIRTT can best fulfill your project requirements. We also strategize on enhancing acoustical privacy and design aesthetics. Beyond walls, we can address floors, ceilings, and networks, ensuring optimal efficiency in defining your building’s functionality. Our goal is seamless integration with your project team to deliver an exceptional space from the start. Just seems Smartt, right?

Smartt-Interior-Construction-Image-5
Smartt-Interior-Construction-Image-4

02. Design

The Smartt design team transforms your vision into DIRTT components using our ICE® software platform, customizing it to your precise specifications. This includes providing detailed pricing, manufacturing, and installation data. Your space can be visualized in an interactive 3D model, allowing for real-time adjustments and immediate updates. You and your team have complete control over the creation of a space uniquely tailored to your needs. Every detail is meticulously reviewed to ensure accuracy, ensuring your space is crafted exactly as you envision before manufacturing begins.

03. Manufacture

Every element of your DIRTT project is precision-manufactured to 1/16 of an inch with minimal waste at facilities throughout North America. With final site verification, we can fine-tune measurements up to the week before you place your order, ensuring seamless integration with the building shell. Off-site manufacturing not only reduces waste but also speeds up construction with exacting precision. Completely customized components fit perfectly into the base building. Now that is Smartt construction!
Smartt-Interior-Construction-Image-7
Smartt-Interior-Construction-Image-6

04. Install

Your DIRTT components arrive at the site fully assembled and ready for installation, saving up to 30% off overall project schedules and minimizing on-site waste. The Smartt project team works closely with you to ensure components arrive precisely when needed and collaborates with other trades for optimal integration on site. Installation is cleaner with minimal debris, noise, and drywall dust. DIRTT integrates smoothly with the rest of your project, adjusting as necessary to site conditions. Should unexpected issues arise, our certified DIRTT Technicians can promptly modify components to keep your build on track.

05. Adapt

Designed for today, prepared for tomorrow. Your space is built to adapt seamlessly to your evolving needs. As your DIRTT Construction Partner, Smartt is here to help with future design adaptations in your agile DIRTT space. Components are interchangeable, offering easy access to electrical, plumbing, networks, and integrated technology—without the hassle and mess of construction. The process is efficient, quiet, and clean. Embrace change confidently with a space that’s future-ready. Now that is Smartt!